Track-Link, AFV model making
Advertisement
    Home        Articles        Reviews        Gallery        Image Library        Forums     Search Login
Latest Updates
 Site NewsMay 1, 2004  
 Articles
  NewAug 2, 2005  
  ModifiedAug 8, 2005  
 Reviews
  NewJun 23, 2008  
  ModifiedApr 21, 2008  
 Gallery
  NewJul 3, 2008  
  ModifiedJan 28, 2008  
 Image Library
  NewDec 16, 2002  
  ModifiedDec 21, 2002  
About Track-Link
  What is Track-Link?
  Submissions
  Join Track-Link
  Site Information
  Terms and Conditions
Recent visitors
  Chris Oldfield
  Yves Christen
  W. Kipp Anderson
  John Yarosh
  Saul Garcia
  Brian Lyall
  Tom Schutrop
  Glenn Bartolotti
  Chris Hughes
  Jim Lewis
  Roy A. Schlicht
Members today:  133
Visitors today:  4092

Modeller Build Logs

Pakistani M4A1E4 Sherman

By James Wechsler
Started: Jan 16, 2006
Updated: Mar 15, 2006

Over the last month or so, I’ve been writing reviews of a number of Formations sets for M4 Shermans. These reviews are of sets I plan to use to build a Pakistani M4A1E4 Sherman, circa 1965. Pakistan was one of the largest post-war users of Shermans, acquiring about 547 as noted in ‘The Sherman Tank in US and Allied Service’ by Steven J. Zaloga. Pakistan fielded a number of variants but most were M4A1 and M4A3 re-manufactured tanks. The particular variant that I’ll be modeling is an M4A1E4 with the E9 ‘double duckbill’ suspension modification. The E4 designation is one given to tanks that had the 76mm M1 gun retrofitted to the 75mm turret. This was first done during WW2 (much like the fitting of the 17 pounder by the British) but with the availability of newly manufactured 76mm Shermans, it wasn’t used very often. However, to save costs compared to changing out an entire turret, this modification was made during the post-war re-manufacturing of Shermans for sale to foreign countries, including both Pakistan and India! The E9 modification involved moving the VVSS suspension outboard about 4 inches so an inner and outer row of extended end connectors (duckbills) could be fitted. This resulted in a track almost as wide as that used on the HVSS equipped Shermans. This modification was also developed during WW2 but was not implemented due to the availability of HVSS Shermans. Like the E4 gun modification, the E9 suspension modification was used for post-war re-manufactured Shermans to save costs compared to switching to an HVSS suspension. The Pakistanis made extensive use of the Sherman in their wars with India (and India also had about 200 Shermans) including their 1965 war where the Shermans were used in a supporting role for the more modern M47 and M48 Pattons. They were even used in the 1971 fighting but only in small numbers (about 40). What items am I going to use? Of course I’m going to use the Formations items I’ve been reviewing. Here’s the list: 1. F015 M4A1 with Applique Armor for Italeri Kits 2. F055 M4/M4A1 Sherman Lower Hull 3. F045 Early High Bustle 75mm Turret 4. F039 76mm Sherman Gun Barrels 5. F053 Late Single Piece Cast Double Brake Transmission 6. F041 Pressed Spoked Sherman Wheels w/Idlers and Spare This covers most of what’s needed. However, there are a few more items needed to complete the project. 1. RHPS T54E1 US Metal Chevron tracks. 2. RHPS EC-2 Extended End Connectors (Duckbills), 2 sets. 3. Tiger Models TMD353023 M4 Sherman Vision Block TC's Cupola. 4. Aber 35a34 Sherman HVSS Fenders. 5. Eduard TP028 Light Guards. In addition, I’ll be using a number of items from the spares box such as the Italeri VVSS bogies, a Dragon muzzle brake from their M4A3(76) Sherman, and drive sprockets from a Tamiya Sherman. I plan to scratch build the E9 suspension modifications and I’ll scrounge around for the other miscellaneous pieces. Up Next: The Lower Hull

Introduction The Lower Hull The E9 Suspension Spacers The E9 Idler Spacers The E9 Suspension & Idlers – Test Mount The Transmission cover and Upper Hull The E9 Suspension – Final Mounting The VVSS Suspension The Fenders – Part 1 The Fenders – Part 2 The Fenders – Part 3 The E9 Suspension Revisited The Turret The Hull Details Painting – Step 1 – Basics Painting - Step 2 - Camouflage and details Weathering – The Wash Stowage Weathering - Pigments The Tracks Final Assembly The Figures The Base Conclusion
[Discussion]

The E9 Suspension – Final MountingJan 29, 2006
I mounted the VVSS spacers and used a tiny amount of putty to fill the gaps. No big deal. Then I mounted the idler spacers. The photos I have show that the spacers were welded to the hull so I laid in a tiny strip of 0.01 inch styrene. I then softened it with Tentax liquid cement and used a small putty knife to make the weld lines. This system works great and is very easy to control.

For the drive sprocket mounts, I used a set of Resicast mounts from the spares box. These are quite nice in that they have the correct detail. Normally, you can't see this but with the sprockets moved outboard, they are visible. I you don't have a set laying around, both the AFV Club and Tasca suspension sets come with well molded sprocket mounts.

Finally, I mounted the idler brackets and gave whole area a shot of primer to see if I’d made any mistakes. So far so good.

Up Next: The VVSS Suspension


    Home        Articles        Reviews        Gallery        Image Library        Forums     Contact Track-Link